Developers Worden Estates identified a long strip of land adjacent to the M6 as the location for a proposed housing estate.

The land, just off Langdale Road, had previously been used for farming. Noise and air pollution from the M6 was clearly a limiting factor, and consequently Miller Goodall was brought in at the early design stage to carry out the noise assessment necessary if the site was to achieve acoustic criteria internally and externally.

Proposition

The location of the proposed estate, very close to a continuous noise source in the form of a busy motorway, presented particular problems relating to noise and air pollution for future occupiers. Although this was a complex proposal, it was made simpler by us being brought into project early on, allowing us to offer advice and guidance from the beginning and enable the noise assessment outcomes to inform the design and subsequent redesign process.

Investigation

We carried out a noise assessment across the site using short-term and long-term measurements. These showed that the site needed to be designed carefully to enable acoustic criteria to be achieved, especially in the private gardens adjoining each property.

Several recommendations were made to the client, including an extensive noise bund and fence barrier bordering the motorway to reduce noise impact. The bund and fencing would be located in such a way as to ensure the acoustic mitigation measures would not be highly visible or impact unduly on the character and appearance of the area. To achieve the internal acoustic criteria within the houses, we proposed the use of acoustic rated glazing and trickle ventilators together with uprated ceilings to top floors to help reduce noise ingress through the roof.

Action and outcome

Planning permission for the residential development, access road, 3m high earth bund and 2.5m high boundary fence bordering the M6 was recently granted, five years after initial investigations began.

What our clients say...

"Great customer service from start to finish. Quick and got the job done to the required standard."

Martin Fearon

Accrington Stanley Community Trust
"We have worked with Miller Goodall for a number of years and always found them to be very responsive in providing an excellent and cost effective service. We would recommend their services to all our clients."

Alban Cassidy

Director, Cassidy & Ashton
"We engaged Miller Goodall to deal with the noise issues likely to be caused by our new industrial development and to provide a report to the local authority planning department. They were helpful and knowledgeable throughout the course of the scheme, specifying the data required to perform their work and liaising directly with the end user as required to arrange the necessary surveying and monitoring. I would not hesitate to recommend Miller Goodall in the future."

Andrew Laidlaw

The Trustland Group
“I would like to thank Miller Goodall for all their help throughout this process. Right from our first phone call, we have found your services to be professional, informative and helpful.”

Kieran O’Donnell

Coccion Construction Ltd
"Excellence from everyone at Miller Goodall!! I have worked with the team since 2019 and they always demonstrate extensive knowledge on acoustic and air quality matters. They effectively communicate complex concepts and are always proactive in identifying potential risks and suggesting solutions. I would definitely recommend to others."

Richard Dimisianos

Prospect Homes
"Miller Goodall was very helpful in completing the noise survey that we required for a planning application we were working on."

Michael Townsend

NWD Architects Limited