Lloyds Wharf, Sittingbourne

Dust assessment for industrial and commercial sources close to a new mixed-use development.

Miller Goodall was instructed to complete air quality, odour and dust assessments to accompany a planning application for a mixed-use development at Lloyds Wharf, Sittingbourne, Kent consisting of 187 residential units (Use Class C3), 260sqm of commercial floorspace (Use Class E) and 104sqm of community floorspace (Use Class F2).

Background

The Lloyds Wharf development is located to the north of the town centre in a mixed commercial and industrial area. The site is a designated Local Wildlife Site and part of a recommended Marine Conservation Zone.

Due to the proximity of the site to waste facilities, wastewater treatment works and industrial uses, the potential impact of odour and dust on users of the development was requested by the local authority.

Odour

Potentially odourous sources close to the development were reviewed and assessed.

This resulted in the completion of a desk-based qualitative meteorological risk assessment using the source-pathway-receptor methodology and impact matrix tables of the screening assessment described in the Institute of Air Quality Management’s (IAQM) guidance ‘Guidance on assessment of odour for planning’. This considers FIDO factors (Frequency, Intensity, Duration and Offensiveness) alongside Location and sensitivity of the receptors.

The assessment concluded that the risk of odour impact is low as there is a large source odour potential but an ineffective pathway due to the low frequency percentage of winds from the source to receptor.

The magnitude of odour impact is considered slight adverse effect, as there is a low risk of odour impact on highly sensitive receptors. The IAQM guidance considers slight adverse effects to be insignificant.

Dust

Potentially dust-generating operations near the site include ready-mix concrete plant, and supplier of building materials.

A semi-quantitative meteorological assessment using the source-pathway-receptor methodology from the Institute of Air Quality Management ‘Guidance on the Assessment of Mineral Dust for Planning (2016)’ was completed.

This methodology considers the amount of time sensitive receptors may be downwind of dust generating operations and classifies the potential risk of dust using matrices from the guidance.

The risk of dust effects were calculated for four businesses located in various directions from the site. The pathway and potential effects were assessed at the proposed location of the new residential properties within the development.

The assessment predicted that the risk of adverse dust impacts to future residential receptors from all four surrounding

Action and Outcome

The methodology and findings of the report were accepted by the local authority. It was agreed that operational dust from the existing commercial premises in the vicinity of the development would not be detrimental to the new users/occupiers and that there were no grounds to object to planning permission based on odour.

Request a quote today, or contact us to talk about your requirements.

Get a quote Contact us

What our clients say...

"Great customer service from start to finish. Quick and got the job done to the required standard."

Martin Fearon

Accrington Stanley Community Trust
"Excellence from everyone at Miller Goodall!! I have worked with the team since 2019 and they always demonstrate extensive knowledge on acoustic and air quality matters. They effectively communicate complex concepts and are always proactive in identifying potential risks and suggesting solutions. I would definitely recommend to others."

Richard Dimisianos

Prospect Homes
"Miller Goodall have offered us a responsive and professional service undertaking surveys and assessments on what is a relatively complex planning scheme. I would not hesitate in using their services and recommending them for future projects."

Dave Starkie

Appletons
"As is always the case, Miller Goodall professionally respond to every situation and provide a high quality and reliable service."

Richard Lever

Property Capital Plc
"Miller Goodall always provides a consistently high service."

Michelle Bath

Director, DPP Limited
“I would like to thank Miller Goodall for all their help throughout this process. Right from our first phone call, we have found your services to be professional, informative and helpful.”

Kieran O’Donnell

Coccion Construction Ltd