Inner Temple

Miller Goodall was appointed by the Honourable Society of the Inner Temple to carry out an air quality assessment for the refurbishment and extension of the Treasury Building at Inner Temple, London.

The Temple area of the city is over 800 years old and has been the home of barristers for over 600 years. Named Project Pegasus, this exciting redevelopment will create modern, flexible space with state-of-the-art facilities for the delivery of education and training programmes for students, pupils and practitioners and ensure the Inner Temple can meet the future needs of every part of its membership and the wider profession.

Proposition

The whole of the City of London is located within an air quality management area (AQMA), so is subject to additional stringent planning regulations relating to air quality. The main contributor to pollutant concentrations within the city is road traffic, but emissions from heating plant also have to be considered. The Inner Temple development, located within a fourth floor extension of the Treasury Building, requires the installation of new boilers and a combined heat and power (CHP) plant. As existing residential receptors are located in close proximity to the proposed flue for the boiler and plant, an assessment of the impact of the new plant on local air quality was required, as was an air quality neutral assessment.

Investigation

We used the dispersion modelling software ADMS Roads Extra to predict the concentrations of nitrogen dioxide (NO2) and particulate matter (PM10) associated with the development at the closest residential receptors. This was then added to the existing background concentrations for the site, taken from the London Atmospheric Emissions Inventory, to determine the actual concentrations experienced at the residential receptor locations. An air quality neutral assessment was also undertaken.

EPUK guidance was then used to provide criteria for magnitude of change and related significance of Quantified impacts as a result of the development.

Action and outcome

The air quality assessment concluded that impact of the development would be negligible at all existing receptor locations. The development would also be air quality neutral. Building work on this prestigious multi-million pound project has now begun.

What our clients say...

"Great customer service from start to finish. Quick and got the job done to the required standard."

Martin Fearon

Accrington Stanley Community Trust
"We have worked with Miller Goodall for a number of years and always found them to be very responsive in providing an excellent and cost effective service. We would recommend their services to all our clients."

Alban Cassidy

Director, Cassidy & Ashton
"Miller Goodall have offered us a responsive and professional service undertaking surveys and assessments on what is a relatively complex planning scheme. I would not hesitate in using their services and recommending them for future projects."

Dave Starkie

Appletons
"Miller Goodall was very helpful in completing the noise survey that we required for a planning application we were working on."

Michael Townsend

NWD Architects Limited
“I would like to thank Miller Goodall for all their help throughout this process. Right from our first phone call, we have found your services to be professional, informative and helpful.”

Kieran O’Donnell

Coccion Construction Ltd
"As is always the case, Miller Goodall professionally respond to every situation and provide a high quality and reliable service."

Richard Lever

Property Capital Plc