Lea Green Carpark

The Lea Green train station has car parking availability for 160 vehicles which are provided in a surface level car park to the north of the station.

A 440-parking space multi storey car park and reconfiguration of the existing surface level was proposed. This would result in a net increase of 280 parking spaces at Lea Green train station and a 1st floor open-to-air parking level.

Proposition

Miller Goodall was appointed to undertake a detailed air quality assessment using the air dispersion model ADMS-Roads to accompany the planning application. Three assessments were completed:

  • A construction phase assessment, with mitigation outlined.
  • Assessment of vehicular emission impacts to existing residents from vehicles entering and leaving the car park into the local road network.
  • Assessment of vehicular emissions from vehicles using the car park and the air quality change to surrounding residents overlooking the car park.

Investigation

An air quality assessment was prepared detailing the findings of all three impact assessments. Cold start emissions are the term that refers to the increased emissions that result from running the vehicle engine outside of the optimal operating temperature. This is common from vehicles that have parked, and the engine has cooled down. The inclusion of cold start emissions was built into our model.

The 1st storey is elevated 4m above ground level and was included as such in the air quality model.

Action and outcome

An air quality assessment report was produced for the planning application which presented the findings of the air quality modelling predictions. Negligible impacts to existing local residents were concluded to arise from vehicle emissions and appropriate dust mitigation was recommended to control the generation and transport of dust during the construction phase.

The planning application was granted planning permission on 15th November 2021.

What our clients say...

“I would like to thank Miller Goodall for all their help throughout this process. Right from our first phone call, we have found your services to be professional, informative and helpful.”

Kieran O’Donnell

Coccion Construction Ltd
"Excellence from everyone at Miller Goodall!! I have worked with the team since 2019 and they always demonstrate extensive knowledge on acoustic and air quality matters. They effectively communicate complex concepts and are always proactive in identifying potential risks and suggesting solutions. I would definitely recommend to others."

Richard Dimisianos

Prospect Homes
"Miller Goodall always provides a consistently high service."

Michelle Bath

Director, DPP Limited
"As is always the case, Miller Goodall professionally respond to every situation and provide a high quality and reliable service."

Richard Lever

Property Capital Plc
"Miller Goodall was very helpful in completing the noise survey that we required for a planning application we were working on."

Michael Townsend

NWD Architects Limited
"Miller Goodall have offered us a responsive and professional service undertaking surveys and assessments on what is a relatively complex planning scheme. I would not hesitate in using their services and recommending them for future projects."

Dave Starkie

Appletons